Landing zone design
Account structure, network topology, identity federation and policy guardrails as the foundation everything else sits on.
Most unhappy cloud stories are the same story: a lift-and-shift that reproduced the data centre on hourly billing. Cloud economics only work when the architecture takes advantage of them, and that means deciding what to re-shape before you move it.
Fig. 01Landing zoneIllustrative
Typical stack
Not every workload belongs in the cloud, and not every workload that does should move unchanged. We assess each one against the three honest options — rehost, re-architect, or leave it where it is — and cost each of them before anything migrates.
A landing zone first. Accounts, networking, identity and guardrails established before the first workload arrives.
Per-workload decisions. Rehost, re-architect or retain, each with a cost model rather than a preference.
Cost visibility from day one. Tagging and budgets enforced by policy, so spend is attributable before it is surprising.
A tested recovery path. Backup and restore actually exercised. An untested backup is a hope, not a control.
Account structure, network topology, identity federation and policy guardrails as the foundation everything else sits on.
Applications and databases moved with a rehearsed cutover, a rollback plan and a defined acceptable downtime.
Multi-zone deployment, health checking and failover designed against a stated recovery objective, not a vague aspiration.
Backup, restore and regional recovery procedures documented and tested on a schedule.
Right-sizing, commitment planning, storage lifecycle rules and the removal of resources nobody has owned for months.
Platform services used where they remove operational burden, with the lock-in trade-off made explicit rather than glossed over.
Inventory before architecture, architecture before migration. Skipping the first step is what produces the surprise invoice.
Every engagement ends with artefacts you own outright and can hand to another team without calling us first.
Infrastructure as code. The whole environment reproducible from your repository, including the landing zone.
A migration runbook. Per-wave cutover steps, verification checks and the rollback procedure — written before the weekend it is needed.
A cost model and budgets. Expected monthly spend by workload, with alerting when reality diverges.
A tested recovery procedure. Restore demonstrated end to end, with the timings recorded.
Usually the one your team already knows, unless a specific managed service or a compliance requirement points elsewhere. The provider is rarely the deciding factor; the operating model is.
Rarely. Multi-cloud doubles the operational surface for a portability benefit most organisations never exercise. We will support it when there is a real driver, and say so when there is not.
Sometimes. A straight lift-and-shift often costs more than the data centre it replaced. We produce a cost model before migration, so the decision is made on numbers rather than on the assumption that cloud is cheaper.
Yes. We start with a review of what is there, what it costs and where the risk sits, then propose changes in priority order rather than recommending a rebuild by reflex.
Both are normal starting points. Tell us what you are running and we will assess it against cost, resilience and the operational load it puts on your team.